Home Addition and Rebuilding: Factors Affecting Renovation

26 April 2023

Taking on a significant home addition or improvement project might be difficult. The variables that might affect the project timetable, which can be as short as six months or as long as three years, are one of the most difficult things for newbies to understand. So, what elements might influence the timing of a home addition project? Let’s investigate.

Site And Location-Specific Concerns

If your site is affected by a wildfire overlay, a stringent council, substantial infrastructure issues, or any other subtle aspects, you may need more specialist guidance, additional applications or permissions, and a longer timescale. As part of the approval process, you may need to interact with additional municipal departments or external bodies.

Time Of Financing

In certain areas, banks demand a completely signed contract with insurance payments before finalising your mortgage or construction loanmortgage or construction loan, whilst in others, a building permit or permission is required but may take some time to get. Waiting for these procedures to be complete can result in long pauses and holding patterns, which can cause the project timetable to slip. In such cases, streamlining and finding overlapping methods might be beneficial.

Holding Patterns

As mentioned above, a project may be halted while waiting for someone to complete their job or for approval to be received before going on to the next stage. Another area that may require a ‘stop’ while you await the conclusion is a development application if one is necessary. It may be feasible to continue working on particular activities while waiting, but it is critical to analyse the risk and seek expert assistance.

Local Regulations

Certain projects have location-specific criteria. In some places, you may be required to select a builder before submitting the Building Approval or Construction Permit since your application requires the builder’s name. Specific specialists may sometimes be required to file specific paperwork before everything is finalised. In certain situations, you may be expected to make all the submissions yourself; in others, you may just be required to submit documentation and fees connected to the building period. Before you begin, it is vital to understand the peculiarities of your local government.

Desired Design Alterations

Of course, some house additions will be straightforward, while others may require more work. If you are modifying the structural footing of an existing home, for example, there may be a lot of pre-work necessary before you can see the new plan come to life. This is especially true when adding a second story to your ideal house, but even simply eliminating walls and opening up space might need structural concerns that take time and require actions in the proper order.

Number of Contractors Involved

When dealing with local trades, you may discover that you can hire an architect, an engineer, a builder, a plumber, and so on individually, but you will still be responsible for bringing all of these crafts and the house expansion to life to your timetable. Choosing a trustworthy contractor to handle your full home addition project from design to construction and interior design is the aim. Defining your project pathway is an important first step in every project, and setting deadlines is critical to evaluating what is feasible and how it fits into your general life.

When you work with Eagle Build Construction and Home Improvement Specialists, we have all of our trades in-house, and we’ll walk you through what’s ahead, the deadlines involved, and what’s possible in delivering your future home. We have the experience and knowledge and a team of professionals working on your behalf to help you save time and minimise delays.